Application:
|
Piles for a dockside flour mill
|
Click photo for larger image (112K).
|
| |
|
Hammer:
|
Champion 240
|
| |
|
Bit:
|
Super Jaws® T710 Under-Reaming Bit
|
| |
|
Casing Size:
|
30 inch (762 mm), 0.374" (9.5 mm) and 0.402" (10.2 mm) wall
|
| |
|
Depth:
|
56 to 95 feet (17 - 29 m), single pass
|
| |
|
Formation:
|
Hard and abrasive granite gneiss boulders, unconsolidated fill containing occasional scrap steel
|
| |
|
Rig Type:
|
Nippon Sharyo DH508-105M piling rig converted to DTH
|
| |
|
Compressors:
|
(3) IR XHP1070WCAT - 1070 CFM/350 PSIG
|
Cores from boulders at three pile locations were tested at the University of Melbourne Rock Mechanics Lab. The results confirmed the boulders
were hard, 160, 122 & 108 MPa, however the distinguishing characteristic was that all three cores were extremely abrasive – more abrasive than 186 MPa Barre granite tested in the same lab.
The site location presented another challenge – the mill is located directly beside the breakwater at the northernmost end of the port. The pile design called for reinforced concrete piles, but seawater could be seen surging through cavities in the breakwater and into the site, and DTH cuttings included an assortment of seashells and lead fishing sinkers.
It was concluded that the wave action must be surging through a large part of the site,
which was confirmed by core drilling the DTH piles already completed. The decision was then made to case every DTH pile on the project, and the piling was successfully completed using this method.
The overall project production rate based on the total metres drilled divided by the compressor engine hours was approximately 5.5 m/hr.